Monday, 21 September 2009

Roman fort gate


Progress on the 10mm Roman fort/wall, with the gate section nearing completion. The top picture shows the gate in position. The bottom picture shows the back of the wall with the steps up to the top of the wall, cut from soil sods. PVA'd with sand on.

No comments: