Friday, 29 April 2011
DFS 230 progress pictures
Some progress pictures of the DFS 230 and stone barn combination. the first picture shows the main base along with the two bases for the severed wing sections which have been covered with PVA glue and sand, along with some small areas of stones. This picture also shows the frame work of the roof of the barn made from cocktail sticks cut down and shaped with a craft knife, to give them a rustic look.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment